8 INDUSTRIAL ELECTRICIANS STABILISE THE START OF A NEW PRODUCTION LINE
A new production line lacked short-notice electrical capacity for wiring, connections, testing and commissioning support.
Overview

The challenge
Parallel work: Control cabinets, sensors and machine connections had to be handled at the same time.
Testing: Functional checks and documentation alignment were required before ramp-up.
Deadline pressure: The production start was tied to deliveries and customer releases.
Our approach
Electrical focus: We looked for control cabinet and machine wiring experience.
Team setup: Eight specialists were grouped by work package and shift.
Communication: A dedicated contact enabled fast feedback during the assignment.

Measured results
The additional electrical capacity advanced open wiring and testing tasks before the planned production start.